What we're shipping
Short, dated notes on what the WasteSync team has built, fixed and learned on the way to October 2026.
A clearer site and a clearer way into the pilot
We redesigned wastesync.co.uk and opened an application route into the Q3 pilot cohort.
All 14 DEFRA test cases passed: cleared for production
WasteSync has passed all 14 of DEFRA's test cases and been approved to connect to the live Digital Waste Tracking system.
Strathclyde Inspire 100 Win
WasteSync picked up two awards at the Strathclyde Inspire 100 event, including the top prize after Ali pitched to a panel of industry experts and investors.
First live demos and two sites signed up to pilot
We put WasteSync in front of a Scottish local authority and an electrical waste processor for the first time. Both watched it capture a load offline and both agreed to pilot.