Built for the sites the mandate hits hardest
The offline-first backup for your weighbridge, for every operation that has to keep the gate moving. Find your site type below.
Primary: Waste Receivers & Permitted Sites
Waste receiving sites are the commercial anchor of the waste supply chain and where WasteSync starts. Under the October 2026 digital tracking mandate, permitted receivers face strict digital validation requirements: if your internet drops or the regulator's API goes down, you cannot legally accept waste without digital tracking.
Landfills & Quarries
Remote locations often suffer from spotty 4G/5G and unstable broadband. WasteSync keeps scales logging loads through zero-signal outages, preventing vehicle backlogs on access roads.
Explore aggregates & scale integration →Transfer Stations & MRFs
High-throughput urban hubs cannot afford even 15 minutes of downtime. A dropped connection creates immediate gate queues. WasteSync's instant local validation keeps traffic moving.
High-volume offline queue managementMulti-Site Operators
Manage multiple remote facilities from a single central dashboard. Monitor offline status, local queue lengths and background synchronisation across your whole footprint.
Centralised compliance dashboardHigh-Risk Outage Sites
Even with reliable fibre, what happens if the national database API drops? WasteSync isolates your gatehouse operations from the wider internet's fragility.
Decoupled API retry logicAlongside the receivers
Waste Producers & Foremen
A lightweight workflow for construction foremen and site supervisors: capture waste logs, signatures and weights on a phone with zero signal and feed clean data to the receiving weighbridge.
See the producer workflow →Electrical & Specialist Processors
Downstream intake for WEEE and specialist streams: keep a compliant record of every inbound load through outages, with the coding enforced at the point of entry.
See the processor workflow →Proven on real sites first
WasteSync pilots run with a Scottish local authority, an electrical waste processor and aggregates operators, under real site workloads. Every rollout starts the same way: a 14-day pilot alongside your current process.